Installation - 5.2 Interface with utilities

chameleon requires: 

Parameter Limits Connection details
Electrical power 115/230VAC +/-10%, ≥10A Amp supply capability IEC inlet. 1.5m cable supplied with instrument. One power connection point is required.
Compressed air 6-10 Bar, 100 l/min capable, oil and moisture free compressed air supply. A cylinder with an appropriate regulator is acceptable. Universal 8mm-5/16” push fit connector for polymer tubing. This is not supplied with the instrument.
Helium 1 – 2 bar (14 – 29 PSI), Grade A, 99.996% purity. A cylinder with an appropriate regulator is acceptable. Universal 4mm-5/32“ push fit connector for polymer tubing. This is not supplied with the instrument.
Vacuum exhaust (optional) Connect to building extraction system if desired Push fit connector for 12mm polymer tubing. This is not supplied with the instrument.
Network Wired connection RJ45 connector. 3m network cable supplied with instrument.

general warningGas pressures should not exceed the limits set above. Otherwise gas fittings may become loose, resulting in gas leaks or burst tubing which could lead to physical injury.

 

chameleon side panel

5.2.1 Electrical connection

Turn chameleon on or off using the main power switch on the right hand side panel.

electrical connections

general warningOnly use the IEC power connector to connect the PC monitor. Using the outlet to power other devices is not supported.

Only use suitably rated IEC electrical power cords. If you need a replacement cord, contact reliance.

 

Next article - Installation - 5.3 User training